FUEL SYSTEM (PGM-FI)
6-53
Route the hoses
19).
Installation is in the reverse order of removal.
• Tighten the connecting hose band screw until the
clearance between the screw and band end is 7.0
±
1.0 mm (0.28
±
0.04 in)
THROTTLE BODY
REMOVAL
• If the sensor unit has been removed, perform the
TP sensor reset procedure (page 6-58).
Remove the luggage box (page 3-5).
Disconnect the sensor unit 5P (Black) connector and
IACV 4P connector.
Release the wire clamp boss from the throttle body.
Loosen the throttle cable lock nuts.
Release the throttle cable from the cable bracket.
Disconnect the throttle cables from the throttle
drum.
Loosen the connecting hose band screw and insula-
tor band screw.
Remove the throttle body.
• Seal the intake pipe with a shop towel or cover it
with a piece of tape to prevent any foreign mate-
rial from dropping into the engine.
TORQUE: Air cleaner housing mounting washer bolt
11 N·m (1.1 kgf·m, 8 lbf·ft)
7.0
±
1.0 mm
(0.28
±
0.04 in)
IACV 4P CONNECTOR
SENSOR UNIT 5P
(BLACK) CONNECTOR
WIRE CLAMP BOSS
Be careful not to
damage the threads
of throttle cable.
THROTTLE CABLES
LOCK NUTS
INSULATOR
BAND SCREW
THROTTLE BODY
CONNECTING HOSE
BAND SCREW
Summary of Contents for SH300I 2006
Page 54: ...MEMO...
Page 55: ...2 1 2 2 TECHNICAL FEATURES HEATER LESS O2 SENSOR 2 2 UNIT SWING ENGINE LAYOUT 2 3...
Page 58: ...MEMO...
Page 216: ...MEMO...
Page 242: ...CYLINDER PISTON 10 2 CYLINDER PISTON COMPONENT LOCATION...
Page 250: ...MEMO...
Page 270: ...MEMO...
Page 296: ...MEMO...
Page 314: ...MEMO...
Page 394: ...MEMO...
Page 422: ...MEMO...
Page 440: ...MEMO...
Page 456: ...MEMO...
Page 484: ...MEMO...
Page 499: ...24 1 24 24 WIRING DIAGRAMS STD type 24 3 ABS type 24 4...
Page 509: ...MEMO...