18-29
• FRAME GROUND
INSTALLATION:
Tighten the 6 x 12 mm flange bolts while pushing each ground
terminal against the projection on the crankcase as shown.
• POWER TILT RELAY GROUND CABLE
INSTALLATION:
1) Connect the Black, Blue, Green/White wire side of the
ground terminal to the upper connection, and the Green,
Green/Black, Blue, Black/White wire side of the ground
terminal to the lower connection as shown.
2) Tighten the 6 x 12 mm flange bolt while pushing each
frame ground terminal against the projection on the
crankcase.
[1]
PROJECTIONS
[4]
PROJECTION
[1]
GROUND WIRE
Bl
Lb
Lg
W
G
Bu
[2]
FRAME GROUND
TERMINAL
[3]
POWER TILT RELAY
GROUND TERMINAL
[5]
FRAME GROUND
TERMINAL
Green to Black terminals
Continuity
Blue to Black terminals
Continuity
Green to White terminals
No continuity
Blue to White terminals
No continuity
b. INSPECTION
• POWER TILT RELAY
Note that the power tilt relay inspection must be made on
single unit of the power tilt relay.
1) Check for continuity between the terminals.