5-2
ENGINE REMOVAL/INSTALLATION
HRX217HYA • HRX217HZA
12.Squeeze the tabs, and remove the Roto-Stop cable from
the bracket.
.
13.Support the engine, and remove the two remaining
5/16-24 x 2-3/8 inch engine mounting bolts and the front
base plate.
14.Remove the engine.
INSTALLATION
Installation is done in the reverse order of removal.
Tighten the engine mounting bolts to the specified torque.
TORQUE: 19.6 ~ 23.6 N•m (14.5 ~ 17.4 ft-lb)
TABS
ROTO-STOP CABLE
FRONT BASE
PLATE
BOLT, 5/16-24 x 2-3/8 in (2)
19.6 ~ 23.6 N•m (14.5 ~ 17.4 ft-lb)
Summary of Contents for HRX217K6HYA
Page 3: ...ii NOTES ...
Page 35: ...2 28 SERVICE INFORMATION HRX217HYA HRX217HZA NOTES ...
Page 53: ...3 18 MAINTENANCE HRX217HYA HRX217HZA NOTES ...
Page 54: ...4 1 4 ROTO STOP DRIVE BELT 1 ROTO STOP 4 2 2 DRIVE BELT 4 10 ...
Page 66: ...6 1 6 MUFFLER 1 REMOVAL INSTALLATION 6 2 6 ...
Page 75: ...7 8 RECOIL STARTER HRX217HYA HRX217HZA NOTES ...
Page 91: ...8 16 FUEL SYSTEM HRX217HYA HRX217HZA NOTES ...
Page 131: ...10 26 CAM PULLEY CRANKSHAFT PISTON CYLINDER HRX217HYA HRX217HZA NOTES ...
Page 149: ...12 10 VARIABLE MOWING SYSTEM MOWER DECK WHEELS HRX217HYA HRX217HZA NOTES ...
Page 150: ...13 1 13 TRANSMISSION 1 REMOVAL 13 2 2 INSTALLATION 13 4 ...