LIGHTS/METERS/SWITCHES
19-14
REMOVAL/INSTALLATION
Remove the top bridge (page 13-27).
Remove the ignition switch mounting screws and
ignition switch.
Install the ignition switch onto the top bridge.
Install and tighten the ignition switch mounting
screws securely.
Install the top bridge in the reverse order of
removal.
HANDLEBAR SWITCHES
RIGHT HANDLEBAR SWITCH
Lift and support the fuel tank (page 3-6).
Open the rubber sheet (page 6-10).
Disconnect the right handlebar switch 6P (Natural)
connector.
Check for continuity between the switch side con-
nector terminals in each switch position.
Continuity should exist between the color coded
wire as shown in the tables.
STARTER SWITCH:
ENGINE STOP SWITCH: (CM and U type)
Close the rubber sheet (page 6-15).
Remove the suitable support and close the fuel tank
(page 3-6).
IGNITION SWITCH
SCREWS
6P (NATURAL) CONNECTOR
Except CM and U type:
CM and U type:
STARTER SWITCH
ENGINE STOP SWITCH
STARTER SWITCH
BAT
ST
COLOR
PUSH
FREE
Bl/W
Y/R
IG
BAT
Bl
Bl/W
COLOR
Summary of Contents for CBR125R
Page 38: ...MEMO...
Page 56: ...MEMO...
Page 84: ...MEMO...
Page 94: ...FUEL SYSTEM PGM FI 5 2 FUEL SYSTEM PGM FI COMPONENT LOCATION 1 2 N m 0 1 kgf m 0 9 lbf ft...
Page 214: ...CYLINDER PISTON 9 2 CYLINDER PISTON COMPONENT LOCATION...
Page 224: ...MEMO...
Page 260: ...CRANKSHAFT BALANCER TRANSMISSION 12 2 CRANKSHAFT BALANCER TRANSMISSION COMPONENT LOCATION...
Page 282: ...MEMO...
Page 392: ...MEMO...
Page 416: ...MEMO...
Page 417: ...20 1 20 20 WIRING DIAGRAMS ED E F II G type 20 3 CM type 20 4 U type 20 5...
Page 428: ...MEMO...