background image

× 

65

× 

10

× 

12

× 

500

× 

45

× 

30

4

×

40

5

×

70

4

×

50

6

×

140

1,4

×

40

M8

×

60

Ø 3 

mm

Ø 4 mm

Ø 5 mm

Ø 8 mm

1/21

BIANCA 28

PREPARE THE 

GROUND

, UNWRAP THE 

PACKAGE, 

LAY OUT THE 

COMPONENTS

, FIND THE 

TOOLS.

Summary of Contents for Bianca 28

Page 1: ...65 10 12 500 45 30 4 40 5 70 4 50 6 140 1 4 40 M8 60 3 mm 4 mm 5 mm 8 mm 1 21 BIANCA 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...KE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C...

Page 3: ...20 6 140 5 mm 3 21 BIANCA 28 ASSEMBLE THE FOUNDATION WITH SCREWS 4...

Page 4: ...21 BIANCA 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 1 1 B...

Page 5: ...4 5 70 4 mm 5 6 140 5 mm 5 21 BIANCA 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 6 1 LG 2 1 LG 2 6 140 5 70...

Page 6: ...6 21 BIANCA 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 7: ...7 21 BIANCA 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD5 3 LOGS IN PLACE...

Page 8: ...8 21 BIANCA 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS A LG 1...

Page 9: ...9 21 BIANCA 28 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 BW1R...

Page 10: ...4 6 140 5 mm 10 21 BIANCA 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 15 LOGS IN PLACE GABLE A TL 1 B TL 1 B LG 2 A LG 3...

Page 11: ...6 6 140 5 mm 11 21 BIANCA 28 43 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFR RFB...

Page 12: ...204 4 50 12 21 BIANCA 28 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 46 RB...

Page 13: ...32 4 40 13 21 BIANCA 28 79 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2...

Page 14: ...32 4 40 3 mm 14 21 BIANCA 28 83 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF EE...

Page 15: ...4 4 40 3 mm 15 21 BIANCA 28 84 ATTACH ROMBS WITH SCREWS ROMB...

Page 16: ...270 4 50 16 21 BIANCA 28 89 20 SCREWS INTO THE FIRST FLOORBOARD 10 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 17: ...30 1 4 40 17 21 BIANCA 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 18: ...12 M8 60 8 mm 18 21 BIANCA 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD...

Page 19: ...90 90 19 21 BIANCA 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 20: ...20 21 BIANCA 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 21: ...21 21 BIANCA 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: