![Hohner ECONOMY 25/40 Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/hohner/economy-25-40/economy-25-40_operating-instructions-manual_2144652021.webp)
Operation
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
21
4.2
Inserting the stitching wire
- Fig. 4.1 -
- Shut off the wire feed by turning the triangular handle -8- 90 degrees to the left or to the right.
Place wire coil -9- on the wire coil carrier -10- and pull stitching wire -45- through from above.
The detailed procedure is as follows:
- Pull through the two rings -11- and the felt disks -12- of the wire guide -13-, through the upper wire
guidance tube -14- between the two transport wheels -15- and a little further into the curved wire
guidance tube -16-.
- Turn the wire feed on again by turning the triangular handle -8- to the right.
Before switching on the machine,
make sure that all protective devices are fit-
ted to the machine and all tools have been removed from the machine!
- Place paper beneath stitching head to catch wire pieces and staples.
- Connect current feed to machine, switch on main switch and operate the foot switch several times
in succession. The wire feed automatically pushes the wire forward.
- Operate the foot switch again, several times in succession, until the first complete staple appears.
In the case of a wire jam at the wire straightening eccentric -17- (see - Fig. 4.2 -),
remove the stitching wire and repeat the process, making sure that the wire
straightening roller in the wire straightening eccentric -17- is "turned down" as far
as possible. The wire must then be straightened again (see 4.3 Wire coil and
straightening the wire).
Quick stroke movements of the stitching heads!
Danger of crushing!
Before carrying out maintenance or repairs, take care that the power supply is switched off
and prevented from being switched on again accidentally.
Never operate the system without properly mounted finger guard.
TIP
Summary of Contents for ECONOMY 25/40
Page 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Page 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Page 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Page 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Page 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Page 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...