Description of the ECONOMY 25/40
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
11
2.1
Dimensions
2.2
Conformity
Please observe the document attached:
„
EC Declaration of Conformity according to the EC Machinery Directive 2006 / 42 / EC
“
2.3
Marking and type plate
The type plate and the CE labelling are fitted below the main switch- Fig. 2.1 -, Pos. 1.
2.4
Technical data
Max. stitching thickness
- clenched
- stubbed
25 mm / 1.000 in.
40 mm / 1.575 in.
Crown width
14 mm / 0.550 in.
Stitching wire, round
No. 21 - 30
(0.80 - 0.35 mm Ø / diametric)
Stitching wire, flat
No. I - VI
(0.70 x 0.35 mm / 0.028 x 0.014 in.
up to
0.96 x 0.78 mm / 0.038 x 0.031 in.)
Exchange parts for loop stitching
up to 3 mm / 0.12 in.
Stitching per minute
206 stitches
Size of stitching table
700 x 240 cm / 27.5 x 9.4 in.
Working height
880 mm / 34.64 in.
Area of the machine
840 x 570 mm / 33.0 x 22.45 in.
Total height of the machine
1540 mm / 60.60 in.
Space required without the operator
920 x 620 mm / 36.20 x 24.40 in.
Insertion depth from clincher box
Pad stitching
Saddle stitching
approx. 95 mm / 3.75 in.
approx. 290 mm / 11.02 in.
Packing dimensions
approx. 1030 x 800 x 1540 mm
approx. 40.6 x 31.5 x 60.6 in.
Net weight
approx. 200 kg / 440 lbs
Gross weight
approx. 240 kg / 530 lbs
Motor
Geared motor
0.55 kW 230/400 Volt
50 Hz (3-phase)
Noise emission, not exceeding
81 dB(A)
Summary of Contents for ECONOMY 25/40
Page 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Page 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Page 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Page 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Page 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Page 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...