ODP 20-4
2,000 Lb. Four Drum Puller
- - 9 - -
© COPYRIGHT 2016 HOGG & DAVIS, INC
Refer to the performance chart for proper hydraulic pressure as
it directly relates to conductor tension. This chart is located on
the control panel of the unit.
***These instructions assume that the operator has set the
proper drive pin for the reel to be pulled in. All other reels are
to be disengaged with the over spin brake fully applied.
Pulling Control
The following instructions explain how to properly set up the unit
when it is to be used as a puller and have a pulling rope with
NO TENSION. DO NOT FOLLOW THESE INSTRUCTIONS WHEN YOU
HAVE A ROPE UNDER TENSION!!
1.
Apply the brake.
2.
Turn the Hydraulic Pressure knob CCW to release
pressure
3.
Increase to approximately full throttle.
4.
Begin to actuate the joystick to take up.
5.
Turn the Hydraulic Pressure Control knob and set to 800
psi.
6.
Release the joystick into the neutral position.
7.
Wait for confirmation from the tension side of the job for
readiness
8.
Release the brake
9.
Increase throttle to full.
10.
As the rope reel begins to take up, increase the
hydraulic to the maximum line pull desired. As the rope
diameter increases on the reel, it might be necessary to
adjust the Hydraulic Control Knob to keep the pull
moving.
11.
Adjust joystick for line speed as also desired.
12.
To stop the pull, place control into neutral while
applying the brake.
Summary of Contents for ODP 20-4
Page 5: ...ODP 20 4 2 000 Lb Four Drum Puller 5 COPYRIGHT 2016 HOGG DAVIS INC...
Page 6: ...ODP 20 4 2 000 Lb Four Drum Puller 6 COPYRIGHT 2016 HOGG DAVIS INC...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 45: ...J04041 REAR STREETSIDE FRONT JACKSTAND J04044 REAR CURBSIDE JACKSTAND Jackstands Page 18...
Page 49: ...NOTE For Units with No electrical box to the left of operator station Page 22...
Page 50: ...NOTE For units with electrical box to the left of operator station Page 23...
Page 51: ...NOTE For units with electrical box to the left of operator station Page 24...
Page 52: ...Page 25...
Page 53: ...Page 26...
Page 54: ...Page 27...