19
19
Stripe Hog Systems
2.3 Ultra-High Pressure Water System
Each manufacturer of the high pressure water
blasting system components provides an informa-
tion and operating manual with its product. It is
extremely important that you read the manuals
and become familiar with the proper care and
operation of the components before operating the
water blasting system.
WARNING
HIGH PRESSURE WATER FROM SPRAY JETS OR RUPTURED
HOSES CAN CAUSE SEvERE INJURY OR EvEN DEATH.
ALWAYS BE SURE WORK AREA IS CLEAR OF PEOPLE,
HANDS, FEET, ETC., BEFORE ENGAGING THE 40K CLUTCH
SWITCH TO ACTIvATE THE ULTRA-HIGH PRESSURE SYSTEM.
Clean Water Tank
The forward tank on the truck chassis provides
storage for the clean water supply. The tank is a
modular design constructed of polyethylene ma-
terial to provide a constant supply of clean, fresh
water to the charge water pump. A site tube pro-
vides a quick view of the water level from outside
the truck during filling operations.
An expandable bladder inside the freshwater tank
provides a reservoir for wastewater pumped to
the bladder from the debris cage drain system
during operation. As the clean water in the tank
is consumed, wastewater from the debris drain
system is pumped into the bladder which expands
into the space created in the tank as the clean
water is consumed. Refer to the Debris cage and
Debris bag at the end of this section for additional
information on the wastewater drain system.
The clean water fill connection on the passenger
side of the tank accommodates large hoses that
are typically connected to a metered source like
a fire hydrant to expedite the filling of the tank.
Operators must always monitor the tank closely
during filling operations as the flow of water from
Typical Clean Water Tank Configuration & Valves
CLEAN
WATER TANK
DRAIN vALvE
CLEAN
WATER TANK
FILL vALvE
CLEAN
WATER TANK
SITE TUBE
Summary of Contents for Stripe Hog SK2000
Page 2: ...2...
Page 6: ...6 NOTES...
Page 142: ...142 NOTES...
Page 147: ...147 Appendix 2 Tools Spare Parts...
Page 148: ...148 Tools Spare Parts...
Page 149: ...149 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 158: ...158 NOTES...
Page 165: ......