18
Necklaces, bracelets, loose clothing and other objects around the machine moving elements
could be dangerous for the operator.
8) Rotate the self-centring spindle pressing the foot control
(
4
) in order to complete the demounting procedure.
9) Let the working arm get away from working area, presssing
the foot control (
1
)
NOTE! Both mounting ad demounting procedure have to be executed rotating the self-centring
spindle clockwise.
the anticlockwise rotatig direction should be used to correct operator failures only.
19
15.0 TIRE MOUNTING PROCEDURE
• B
efore starting the mounting procedure, check if the rim and
tire are damaged both inside and outside and on the whole tire
surface.
• Grease the whole inside rim surface and both tire beads.
Avoid to grease the valve/sensor
1) Position the greased tire on the rim, tilt it and press the foot
control (
1
) to recall the vertical working arm (be sure there is no
obstacles)
Make sure the demounting tool is positioned on the rim edge
perfectly
2) Position the tire agianst the demounting tool cor-
rectly. the tire bead has to b over the
nail
and under
the tool
rounded part
.
The inflating valve have to be positioned far
from the mounting tool.
3) Rotate the self-centring spindle clockwise, pres
-
sing the foot control (
4
) and make sure the lower
tire bead position itself inside the the rim hump, du-
ring this operation.
At the same time, help the lower tire bead to insert
itself in the lower rim hump manually.
CAUTION!
Make sure the rim and the tire rotate at the same time
15.1) LOWER TIRE BEAD MOUNTING OPERATIONS
Nail
Rounded part
Tool picture
21
Summary of Contents for Megamount Twister EVO CP
Page 35: ...33 4 3 35 ...
Page 36: ...34 24 0 ELECTRICAL SCHEME 24 1 230V 1Ph 50 60 Hz 36 ...
Page 37: ...35 37 ...
Page 38: ...36 24 2 110V 1Ph 50 60 Hz 38 ...
Page 39: ...37 39 ...