
User Manual
Hot Well
- 12 -
5.2 Installation and Electric Connection
5.2.1 Installation (only valid for installation variants)
•
Put your device on a level and safe surface which stands the weight of the device.
•
Prepare the cut-out of the table according to our installation drawings and check the
cut-out.
•
For Dekton (artificial stone) and stone plates please refer to the stone manufacturer
’
s
references.
•
Make sure the surface is free from dust and grease.
•
Put your well into the cut-out and adjust the accurate height with the adjusting screws.
Please make sure that the well fits exactly.
•
Connect the controller and both cables to the circuit board according to the connection
plan.
•
Locate the well in the middle of the cut-out.
NOTE regarding the Installation
•
The device must be installed in vertical position.
•
The built-in Hot Wells can be built-in flush-mounted or sunk in every top plate (wood, granite,
corean or stainless steel).
ATTENTION
!
The device must be installed by a qualified professional.
5.2.2 Electrical connections
•
The socket circuit must be secured according to the performance details.
•
Connect the controller to the electronical box.
•
Plug the Schuko plug into the socket.
5.3 Operation
•
Clean the device prior to use as described in chapter
6.2 "Cleaning".
•
Press the
button to switch on the device.
•
Do not place food directly on the surface. All foods should always be placed in appropriate
containers on the surface of the Hot Well. Use only suitable tableware.
Do not use plastic ta-
bleware
.