EVAPORATION UNITS AIR-AIR  

MAINTENANCE 

 
 

 

 
 
It is advisable to do maintenance works every 1.000 operating hours as well as at the beginning of each cooling season. 
 
In  case  of  leakage,  any  manipulation  and  /  or  recovery  of  refrigerant  must  be  carried  out  by  qualified  and  accredited 
personnel in the current regulations. 
 
 

CONSERVATION AND CLEANING 

 
Electrical circuit

: Make sure that all electrical connections -wires, contactors and terminals- are properly tight. Record the 

readings for volts and amperes of each compressor and fan motor. Verify the starting current. Check the good operation 
of all relays, pressure switches and phase sequence relay of Scroll compressor. 
 

Coils

: At least once a year, clean condenser coils with water and detergent, then dry with air at a low pressure. Never 

clean with wire brush. 
 

Fans:

 Check the direction of rotation of the fans. Examine the support of the fans. Check the operating status. 

Before  handling  the  fan,  make  sure  that  it  is  disconnected  from  the  main  power,  even  if  it  is  already  stopped  and  that 
nobody can start it during the intervention.  
- It is necessary to make a regular inspection of the unit. Its frequency must be based on the working conditions to avoid 
the accumulation of dirt in propellers, turbines, motors and grids that could entail risks and shorten its life.  
- Be very careful not to unbalance the propeller or the turbine in cleaning operations. 
- Must observe the current safety legislations of each country in all maintenance and repairing works. 
Motors and fans do not need any additional lubrication. 
 

Transmission belts:

 Check the status and the tension of the transmission belt, at least twice the first operating month, 

after every 1000 operating hours. 
 

Drainage system

: Verify condition and good operation of the drainage tray and the drain trap. 

 

Air filters: 

Clean filters after the first operating hours to collect possible light materials such as papers, pieces of porexpan, 

etc. left over from the installation and that have been dragged through the air circulation. Clean again every 3 months (or 
more often according to its operation). The filter can be cleaned with soapy water, after rinse it with clean water and let 
dry. If necessary, replace filters before they are in bad conditions (check current legislation of each country, EN 779, UNE-
EN 

13053…). 

 

 

Before performing any service or maintenance operation it is mandatory to turn off the main 

power switch of the system to avoid any personal injuries. Locked it so that nobody other 

than a qualified technician can switch on electrical power

 

WARNING! 

Summary of Contents for CLVBA-CLVA 401

Page 1: ...401_208095_200801_EN INDOOR UNITS FOR DUCT INSTALLATIONS AIR AIR CLVBA CLVA ECCEECHAECHA Cooling Only Heat Pump Model 401 Cooling Capacities 12 1 kW Heating Capacities 12 7 kW INSTALLATION OPERATION MAINTENANCE MANUAL ...

Page 2: ...oach is based on efficiency flexibility and on practical solutions This has been the hallmark of our product catalogue The versatility of our factory allows us to deliver solutions that can meet any requirement and we endeavour solving any problem that may arise in designing and implementing air conditioning installations From all of us at Hiplus Aire Acondicionado once again thank you very much ...

Page 3: ...N 8 RIGGING 8 STORAGE 8 INSTALLATION 9 INSTALLATION LOCATION 9 UNIT SETTLEMENT 9 SERVICE AREA MM 9 WEIGHT DISTRIBUTION 9 DIMENSIONS 10 DRAINAGE 11 AIR DUCTS 12 DESIGN OF THE REFRIGERANT PIPES 12 ELECTRICAL INSTALLATION 12 ELECTRICAL DATA 12 Electrical connections 13 OPERATION 14 BEFORE START UP 14 START UP 14 INDOOR FAN TRANSMISSION ADJUSTMENT 15 OPERATION LIMITS 16 MAINTENANCE 17 CONSERVATION AND...

Page 4: ...ontinuous improvement in design and performance to which we are committed to gives us the right to modify the specifications of our products without prior notice Electrical Supply Check that the electrical network features comply with the data shown in the data nameplate of the unit Local Safety Regulations Observe and analyse all the possible causes of accidents that may arise in the place or pla...

Page 5: ...ion or modification of the unit will automatically invalidate the warranty Packaging and Replacement of Equipment The material of the package plastic bags insulating materials nails etc is a potential source of danger Consequently it should be kept out of the reach of children and properly recycled according to the valid local safety regulations Do not mix this product with household waste at the ...

Page 6: ...ion commissioning and carry out maintenance works Unqualified staff can only make basic tasks such as cleaning and replacement of filters etc Prevent access to children so they cannot play with the appliances In every visit all precautions must be taken into account those recommended in the installation operation and maintenance instructions as well as the ones indicated in labels of the unit Do n...

Page 7: ... 10 SS Motor power kW 0 55 Voltage V 400 3 N REFRIGERANT Tiype R410A Global Warming Potential GWP 3 2088 Charge 4 1 Return temperature 27 C dry bulb and 19 C humid bulb evaporation temperature 7 C 2 Return temperature 20 C condensation temperature 40 C 3 GWP Global warming potential climatic of 1 kg of greenhouse gas relative to 1 kg of CO2 calculated in terms of 100 year warming potential 4 The c...

Page 8: ...milar to the one shown below Be sure to hoist the machine through the points indicated in the diagram Make sure that the unit is balanced stable and without any deformations when it is lifted STORAGE If the equipment is going to be stored before the installation please follow the instructions below in order to avoid damages corrosion or deterioration Move it carefully Do not place the machine in p...

Page 9: ...talled is able to support its weight in operation Fit shock absorbers throughout the installation to prevent the transmission of noise and vibration Check that the direction of the sound level is not going to disturb anyone UNIT SETTLEMENT Make sure that the unit is correctly levelled The bed frame should have the area and the strength to support the weight of the unit Be sure that after settlemen...

Page 10: ...AIR AIR INSTALLATION DIMENSIONS Model CLVBA CLVA 401 LEGEND 1 Electrical heater option 2 Supply plenum option 3 Heat water resistance option 4 Coil 5 Fan 6 Fan motor 401 model 7 Fan motor 501 model 8 Air filter 9 Power connexion inlet 10 Gas line 11 Liquid line 12 Drain ...

Page 11: ...on depending on the line length and general building configuration The drainage line should inclined a minimum 2 for proper water evacuation When drain line is exposed to temperatures below 0 degrees it is necessary to cover with thermal insulation or electrical heating wire to avoid water freezing and tube damages It is convenient to install the water drain trap with proper dimensions see diagram...

Page 12: ...e instructions stated in the condenstion unit ELECTRICAL INSTALLATION Unit power supply should be within 10 of volts indicated on the unit nameplate Damage caused by the start up of the unit in an incorrect voltage line is not covered by Hitecsa s warranty When making electrical connections always use the unit wiring diagram The line protection elements have to be placed by the installer according...

Page 13: ...APORATION UNITS AIR AIR INSTALLATION ELECTRICAL INSTALLATION Electrical connections For further information please refer to the user manual and to the electrical diagram Legend 1 Ground 2 Power supply 3 Magnetothermal circuit breaker D curve differential ...

Page 14: ...lied with any other voltage than that the indicated on the serial plate The power supply to the unit must be within 10 of the voltage indicated on the serial plate Check the correct rotation direction of the fans The installer must place line protection elements in accordance with current legislation Wiring of electrical connections must be protected by a tube or other cable conduits Make sure if ...

Page 15: ...et screws 4 Place the belt in the pulley cannel The closure of opening of the pulley could void the size of the prior belt In this case replace it for other belt of the same profile and with the appropriate length 5 Tighten the belt by using tensor screw or sliding the motor depending on the case Align fan and motor pulleys 1 Loose fan pulley set screws 2 Slide fan pulley along the shaft and align...

Page 16: ...nal value it means that the unit air flow is too low MODELS Nominal Pulley Correa Open kW A Fixed Variable 401 0 55 1 52 150 E20 1A 75 100 E19 1A A 40 1 OPERATION LIMITS AMBIENT AIR TEMPERATURE DRY TEMP HUMID TEMP COOLING CYCLE ºC ºC Standard conditions 27 19 Minimum conditions 21 15 Maximum conditions 32 21 AMBIENT AIR TEMPERATURE DRY TEMP DRY TEMP HEATING CYCLE ºC ºC Standard conditions 20 Minim...

Page 17: ...t be based on the working conditions to avoid the accumulation of dirt in propellers turbines motors and grids that could entail risks and shorten its life Be very careful not to unbalance the propeller or the turbine in cleaning operations Must observe the current safety legislations of each country in all maintenance and repairing works Motors and fans do not need any additional lubrication Tran...

Page 18: ...18 IOM_CLVBA CLVA_401_208095_200801_EN CLVBA CLVA EVAPORATION UNITS AIR AIR Subject to modifications without prior notice ...

Reviews: