INSTALLATION
INSTALLATION SITE
Consult and respect the rules and local regulations which regulate the installation of air conditioning systems.
Choose a site without dust and debris.
Respect the appropriate service area for the equipment that is to be installed.
Verify that the ground or structure on which the unit will be installed is able to support its weight in operation.
Fit shock absorbers throughout the installation to prevent the transmission of noise and vibration.
Check that the direction of the sound level is not going to disturb anyone.
UNIT SETTLEMENT
Make sure that the equipment is levelled correctly.
The bed frame shall be strong enough to support the unit weight.
Verify that the drains are working properly.
Use shock-absorbers for installation.
The manufacturer’s warranty will not cover any refrigerant leakage caused by deterioration due to vibrations if the
shock-absorbers have not been installed correctly between the floor/base stand and the unit.
DRAIN
All the drains are provided with a 3/4” male gas connection (MPT).
The diameter of the condensate drain pipe shall be equal or larger than the unit connection depending on the line
length and the building configuration.
The drainage line shall have a slope of not less than 2% to guarantee the correct evacuation of the condensate water.
When the drain line is exposed to air temperatures below 0 degrees, thermal insulation or electrical heating wires
shall be used to prevent the water from freezing and avoid the possible following tube damages.
Install a siphon with the appropriate dimensions (refer to drawing).
ELECTRICAL INSTALLATION
The unit power supply shall be within the 10% of voltage value indicated on the unit nameplate. The Hitecsa warranty
will not cover any damage caused by the start-up of the unit with an incorrect voltage.
Always refer to the unit wiring diagram when completing electrical connections.
The electrical wiring connections and the line protection devices must be installed by the installer according to the
current local laws.
The interconnecting wires shall be protected by a tube or an electrical cable conduit, cable tray, etc.
Turn the main power switch off before starting any type of operation.