![Hitecsa ACHA 1001 Installation, Operation & Maintenance Manual Download Page 17](http://html1.mh-extra.com/html/hitecsa/acha-1001/acha-1001_installation-operation-and-maintenance-manual_2140061017.webp)
17
IOM ACHA-ACHBA_201a1201_208000_180901_EN
ACHA / ACHBA
PACKAGED COMPACT
HORIZONTAL AIR - AIR
ELECTRICAL INSTALLATION
Unit power supply should be within 10% of volts indicated on the unit nameplate. Damage caused by the start-up
of the unit in an
incorrect voltage line is not covered by Hitecsa’s warranty.
When making electrical connections always use the unit wiring diagram.
Be sure that the compressor crankcase heater can be energized before unit start.
The line protection elements have to be placed by the installer according to the current legislation local laws.
The interconnecting wires have to be in the protection tube or electrical cable conduits, cable trays, etc.
Before starting any type of operations put in position off main power switch.
WARNING!