![HITEC D2414 Manual Download Page 17](http://html1.mh-extra.com/html/hitec/d2414/d2414_manual_2139913017.webp)
Hitec Luxembourg S.A. |
5, Rue de l’Église, L-1458 Luxembourg
www.hitec.lu | [email protected] | Tel.: (+352) 49 84 78 - 1 | Fax. (+352) 401303
File Name: HTCA_003-DADS-UserManual.docx
Document Type: End User Manual | Version date: 01/05/2010 | Last Printed: 15/02/2011
Page 17/81
DABS & Burette Installation
When you get the DABS equipment, remove it from its shipping box and set on a working
table. The equipment is delivered with standard parts which you need to check with the
Packing List.
Equipment and Parts
Equipment:
Final DABS configuration after all
needed parts are set on place.
Depending of the purchase, the
burette can be from SCHOTT (as
on picture) or from METROHM.
The Chamber is delivered already
mounted on the equipment and
ready to work.
The Burette link cable can be
different according with the Burette
purchased.
Parts List:
1. 10m Serial link cable RS232
2. Burette link cable
3. Mains power cable
4. Beaker 250ml
5.
Allen-key tool
6.
Pack of 10 fuses
7. Main Box Key
8. Knurled nuts (for mixing chamber)
9. Weight support block
10.
Oil debit tube + nozzle