
Preparation initial
check
Technical Catalogue
5
27
TCGB0051 rev 0 - 09/2009
5.4. Service space and foundation
RCUE 40, 50 60CLG2
RCUE 80, 100, 120CLG2
Detail of foundation (example: RCUE60CLG2)
Nº
Name
Nº
Name
1
4-Ø 26 (Mounting Holes)
8
Steel Plate (1 mm)
2
Electrical Box
9
Concrete
3
Bottom Frame
10
Vibration proof Rubber Mat (1 mat per position) (option)
4
Vibration proof Rubber Mat (4 positions)
11
Washer
5
Vibration proof Rubber Mat (8 positions)
12
Nut
6
Foundation bolt (M20)
13
Bottom Frame
7
Rubber Bush (option)
Summary of Contents for SAMURAI CLG2
Page 2: ......
Page 4: ......
Page 6: ......
Page 10: ......
Page 12: ......
Page 46: ......
Page 62: ......
Page 66: ......
Page 82: ......
Page 94: ...Drawings Technical Catalogue TCGB0051 rev 0 09 2009 94 14 2 4 Main printed circuit board ...
Page 95: ...Drawings Technical Catalogue 14 95 TCGB0051 rev 0 09 2009 14 2 5 Relays printed circuit board ...
Page 98: ......
Page 112: ......
Page 116: ......
Page 117: ......