30
PJ-TX300(C11H2)
7. Wiring diagram
Wiring diagram 1
C
N
P
O
W
C
N
P
W
R
C
N
10
2
C
N
10
3
C
N
3
C
N
10
1
TS
W
C
10
4
T2
01
C
N
1
FE
B
2
FE
B
1
C
D
2
T1
01
C
N
2
C
N
B
A
R
C
N
1
T1
E
A
04
E
T0
2
C
NCO
Wiring of power supply circuit/ballast boards
Wiring of the power supply circuit board (1) Connect the TSW (2) Connect the CNPOW (3) Connect the CNPWR, attach FEB2 (4) Connect the CN1, attach FEB1 to CN1 and C
D2
When connecting the connector of the CN1, completely lock the shorter side of the cable wire to the CN3.
Attach FEB1 (ferrite core) to CN1 and CD2. Make sure to completely lock the hook when attaching the FEB1.
Confirm that CN102 and CN103 are securely connected. (It will not be possible to confirm
this
in the manufacturing process lat
er)
Attach FEB2 (ferrite core) to the CNPWR. Make sure to completely lock the hook when attaching the FEB2. Leave it on the same side as the circuit board.
When connecting the CNPWR connector to the CN101, make sure it locks in place completely.
Wiring of the control circuit board (1) Connect the CNCO
Control circuit board
Main circuit board
I/O metal
Area of Importance
Th
e
op
er
at
io
ns
w
ith
th
is
s
ym
bo
l h
av
e
im
pl
ic
at
io
ns
w
ith
la
w
s/
st
an
da
rd
s.
It
is
p
os
si
bl
e
to
b
e
in
v
io
la
tio
n
of
th
es
e
la
w
s/
st
an
da
rd
s
in
th
e
ca
se
th
at
th
es
e
op
er
at
io
ns
a
re
n
ot
ca
rr
ie
d
ou
t
ac
co
rd
in
g
to
t
he
in
st
ru
ct
io
ns
.
A
ss
em
bl
e
accordin
g to the operation instructions.
Wiring of the ballast power supply board (1) Connect the CNBAR (2) Wire the lamp lead and CNBAR
Confirm that the CNBAR is securely connected (It will not be possible to confirm this in the manufacturing p
rocess later)
Lamp lead
Pass the lamp lead and CNBAR through the slit in the insulation sheet
Ballast bracket
insulation sheet
Area of importance
Area of importance