
GR4000 Installation Guide Version 1.00 - Preliminary
200
520-10-014-20X
5.7.4
Replacing a double-size NIF with a single-size NIF
WARNING: THE REPLACEMENT OF A NETWORK INTERFACE BOARD SHOULD BE
DONE BY A TRAINED ENGINEER OR A QUALIFIED MAINTENANCE PERSON.
!
Caution: Do not touch the electronic components on the solder side of a network
interface board. To avoid damage, always store these components in approved
anti-static bags.
Step 1
Remove a double-size network interface board.
(
As for the detachment of a
double-size NIF, see the section 5.7.2.
)
Step 2
Remove a packet routing unit.
(
As for the detachment of a packet routing
unit, see the section 5.6.
)
Step 3
Attach a guide rail to a packet routing unit.
Figure 5.7-13 Guide rail being attached to a packet routing unit
Guide rail
Packet routing unit