
Figure 4-49 Confirming the smart configure status
Restarting BMC procedure
When you installed a new server blade, restart BMC.
1
.
[For CB 520A A1, CB 520H A1/B1/B2/B3/B4, CB 540A A1/B1, and Non-
SMP CB 520X B1/B2/B3]
Select Resources tab and select Modules > All Modules > Server
blades > target server blade.
[For SMP CB 520X B1/B2/B3]
Select Resources tab and select Modules > All Modules > Server
Blades > Server Blade n of the SMP configuration > Server Blade n
(Primary).
2
.
Click BMC > Restart BMC in lower right pane.
4-56
Common process for replacement
Hitachi Compute Blade 500 Series System Service Manual
Summary of Contents for CB 520A A1
Page 26: ...xxvi Preface Hitachi Compute Blade 500 Series System Service Manual ...
Page 152: ...4 64 Common process for replacement Hitachi Compute Blade 500 Series System Service Manual ...
Page 294: ...6 12 Identifying RAID rebuild status Hitachi Compute Blade 500 Series System Service Manual ...
Page 432: ...9 16 Updating firmware Hitachi Compute Blade 500 Series System Service Manual ...
Page 439: ...Change LOM configuration 10 7 Hitachi Compute Blade 500 Series System Service Manual ...
Page 442: ...10 10 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Page 450: ...10 18 Change LOM configuration Hitachi Compute Blade 500 Series System Service Manual ...
Page 464: ...11 14 Troubleshooting Hitachi Compute Blade 500 Series System Service Manual ...
Page 465: ...Hitachi Compute Blade 500 Series System Service Manual ...