3 Servicing
Cycle components
SMGB0120 rev.0 - 11/2017
73
3
3.3.9
Replacement of the stop valve (with check joint)
1
Remove the brazed parts using a blowtorch
and previously cooling the pipe side and the
stop valve unit with wet cloth in order to avoid
brazing material enter inside the pipes.
Stop valve Check joint
Brazed parts
3.3.10
Replacement of the high pressure switch (PSH)
1
Disconnect the cables (9 and 10 of the
Pressure switch from the E-box of the
compressor terminal board).
2
Remove the screw of the clamp that fixes the
switch.
3
Unscrew the switch and proceed to its
replacement
4
When reassembling proceed in reverse order
than removing.
High pressure
switch (PSH)
Clamp
Screw
3.3.11
Replacement of the pressure sensor (Pd)
1
Disconnect the cables (4, 5 and 6 of the
pressure sensor from the E-box of the
compressor terminal board).
2
Remove the screw of the clamp that fixes the
switch.
3
Unscrew the switch and proceed to its
replacement
4
When reassembling proceed in reverse order
than removing.
High pressure
sensor (Pd)
Clamp
Screw
3.3.12
Replacement of the pressure sensor (Ps)
1
Disconnect the cables (1, 2 and 3 of the
Pressure sensor from the E-box of the
compressor terminal board).
2
Unscrew the sensor and proceed to its
replacement
3
When reassembling proceed in reverse order
than removing.
Pressure sensor
(Ps)