3 Servicing
Cycle components
SMGB0120 rev.0 - 11/2017
65
3
3.3.2 Overhaul work
Perform the work according to “Semi-hermetic Hitachi Screw Compressor Manual”.
When removing a compressor from the refrigeration cycle, high pressure part shall be separated between the projecting
part flange of compressor and the upper cover of oil separator. Do not separate high pressure part between the check
valve and the projecting part flange of compressor, as collected refrigerant would be spilled out.
Low-pressure side
Disconnect from this part
High-pressure side
Disconnect from this part
Upper cover of
oil separator
Projecting part flange
of compressor
Check valve
Do not remove these bolts
or refrigerant is ejected
Remove
these
bolts firstly