
Port assignments for the back-end module
Number
Port 0
Port 1
DKB-01D
01D-0
01D-1
DKB-01H
01H-0
01H-1
DKB-02D
02D-0
02D-1
DKB-02H
02H-0
02H-1
DKB-11D
11D-0
11D-1
DKB-11H
11H-0
11H-1
DKB-12D
12D-0
12D-1
DKB-12H
12H-0
12H-1
Fabric-acceleration module
Number
Item
Description
1
Ports
2
TBD
Blinking (Yellow): The target
port is incorrectly
connected.
On (Yellow): Any of the
ports is incorrectly
connected.
Green: Not used.
3
PORT (LINK/LOCATE)
On (Blue): Linked state.
Port assignments for the back-end module
Chapter 2: Hardware overview
Hitachi Virtual Storage Platform 5000 Series Hardware Guide
25