English
11
(2) Regarding the temperatures of the rechargeable
battery
The temperatures for rechargeable batteries are as
shown in
Table 2
, and batteries that have become
hot should be cooled for a while before being
recharged.
Table 2
Recharging ranges of batteries
(3) Regarding recharging time
Depending on the combination of the charger and
batteries, the charging time will become as shown in
Table 3
.
Table 3
Charging time (At 20°C)
NOTE:
The charging time may vary according to temperature
and power source voltage.
4. Disconnect the charger’s power cord from the
receptacle.
5. Hold the charger firmly and pull out the battery.
NOTE:
After operation, pull out batteries from the charger
first, and then keep the batteries properly.
Regarding electric discharge in case of new
batteries, etc.
As the internal chemical substance of new batteries
and batteries that have not been used for an extended
period is not activated, the electric discharge might
be low when using them the first and second time.
This is a temporary phenomenon, and normal time
required for recharging will be restored by recharging
the batteries 2-3 times.
How to make the batteries perform longer
(1) Recharge the batteries before they become completely
exhausted.
When you feel that the power of the tool becomes
weaker, stop using the tool and recharge its battery.
If you continue to use the tool and exhaust the electric
current, the battery may be damaged and its life will
become shorter.
(2) Avoid recharging at high temperatures.
A rechargeable battery will be hot immediately after
use. If such a battery is recharged immediately after
use, its internal chemical substance will deteriorate,
and the battery life will be shortened. Leave the battery
and recharge it after it has cooled for a while.
CAUTION:
䡬
When the battery charger has been continuosly used,
the battery charger will be heated, thus constituting
the cause of the failures. Once the charging has been
completed, give 15 minutes rest until the next
charging.
䡬
If the battery is recharged when it is warm due to
battery use or exposure to sunlight, the pilot lamp
map light in green.
The battery will not be recharged. In such a case, let
the battery cool before charging.
䡬
When the pilot lamp flickers in red (at 0.2-second
intervals), check for and take out any foreign objects
in the charger’s battery installation hole. If there are
no foreign objects, it is probable that the battery or
charger is malfunctioning. Take it to your authorized
Service Center.
PRIOR TO OPERATION
1. Preparing and checking the work environment
Make sure that the work site meets all the conditions
laid forth in the precautions.
2. Checking the battery
Make sure that the battery is installed firmly. If it is at
all loose it could come off and cause an accident.
3. Installing the bit (WH14DBAL2 / WH18DBAL2)
Always follow the following procedure to install driver
bit. (
Fig. 5
)
(1) Pull the guide sleeve away from front of the tool.
(2) Insert the bit into the hexagonal hole in the anvil.
(3) Release the guide sleeve and it returns to its original
position.
CAUTION:
If the guide sleeve does not return to its original
position, then the bit is not installed properly.
4. Selecting the socket matched to the bolt
(WR14DBAL2 / WR18DBAL2)
Be sure to use a socket which is matched to the bolt
to be tightened. Using an improper socket will not
only result in insufficient tightening but also in
damage to the socket or nut.
A worn or deformed hex. or square-holed socket will
not give an adequate tightness for fitting to the nut or
anvil, consequently resulting in loss of tightening
torque.
Pay attention to wear of socket hole, and replace
before further wear has developed.
5. Installing a socket (WR14DBAL2 / WR18DBAL2)
Select the socket to be used.
䢇
Pin, O-ring type
(1) Align the hole in the socket with the hole in the anvil
and insert the anvil into the socket.
(2) Insert the pin into the socket.
(3) Attach the ring to the groove on the socket.
䢇
Plunger type (
Fig.6
)
Align the plunger located in the square part of the
anvil with the hole in the hex. socket. Then push the
plunger, and mount the hex. socket on the anvil.
Check that the plunger is fully engaged in the hole.
When removing the socket, reverse the sequence.
䢇
Retaining ring type
(1) Align the square portions of the socket and the anvil
with each other.
(2) Make sure to firmly install the socket by pushing it all
the way into the anvil.
(3) When removing the socket, pull it out of the anvil.
CAUTION:
䡬
Please use the designated attachments which are
listed in the operations manual and Hitachi’s catalog.
Accidents or injuries could result from not doing so.
Rechargeable batteries
Temperatures at which the
battery can be recharged
BSL1430, BSL1830
0°C – 50°C
BSL1440, BSL1840
Charger
UC18YRSL
Battery
BSL1430, BSL1830
Approx. 45 min.
BSL1440, BSL1840
Approx. 60 min.
01Eng_WH14DBAL2_WE
7/10/12, 16:14
11
Summary of Contents for WH 14DBAL2
Page 3: ...2 10 9 12 11 P Q O S T L M N R 00Table_WH14DBAL2_WE 7 10 12 16 14 2 ...
Page 78: ...77 08Back_WH14DBAL2_WE 7 10 12 16 17 77 ...
Page 80: ...79 1 2 3 4 5 08Back_WH14DBAL2_WE 7 10 12 16 17 79 ...
Page 82: ...81 08Back_WH14DBAL2_WE 7 10 12 16 17 81 ...