58
1、
Brake pump assembly
2、flange boltM6×20 3、tape3(L=150) 4、)
tape4 (L=200) 5、tape3(L=150) 6、flange boltM6×30 7、flange boltM6
×20 8、band 9、flange boltM6×20 10、brake tube seatI 11、
Brake
components
4.2.1 Preparation for inspection before the maintenance of the
brake system.
。Brake system is crucial to the life safety of the operator
and therefore must be periodically inspected and maintained.
This vehicle uses the double return route hydraulic pressure
disc brake system.Please follow the tips of inspection as
below.
a)
To check the amount of liquid in the oil cup.If it
is
lower
than
the
minimun
mark(Attached
figure4-2-1),refill the box with the same type of fluid
as was recommended by the manufacturer,to ensure the
fluid level is higher than the minimum mark.
Lowes tminimun mark
Summary of Contents for 700UTV
Page 1: ...1 700UTV Maintenance Manual...
Page 5: ...5 General Information 1 Description...
Page 88: ...88 1 rear axle differential components 2 retarder shell 3 sulcate ball bearing6305 4...
Page 103: ...103 4 8 Iubrication points The details of the chassis lubrication is as below...
Page 124: ...124...