101
。Start engine when pour full the refrigerating fluid, loose
the exhaust nut on the pipe,the water level will get lower at
this time,Supply the refrigerating fluid until the water level
stop to change,then screw the exhaust nut,cover the water tank
lid.The water tank inspection is finished. .
4.7.2.2 Oil Cooling System
Except the Cooling System of the engine,this UTV is also
equip the Oil Cooling System.( Figure)
4.7.2.3Disassembly, Inspection and Assembly of Oil Cooling
System
1、Disassemble the oil cooler
2、Disassemble the connecting steel oil pipe
3、Disassemble the connecting pressure resistancerubber
pipe
4.2.2.4Inspection and maintain the Oil Cooling System
1、Checke if the oil cooler is distortion and leak oil.To
adjust the distortion one,and welding the leak one.If
it can not solve,instead the oil cooler
Checke if the steel oil pipe is distortion and leak.To
adjust,intead the serious distortion one and leak oil pipe.
Summary of Contents for 700UTV
Page 1: ...1 700UTV Maintenance Manual...
Page 5: ...5 General Information 1 Description...
Page 88: ...88 1 rear axle differential components 2 retarder shell 3 sulcate ball bearing6305 4...
Page 103: ...103 4 8 Iubrication points The details of the chassis lubrication is as below...
Page 124: ...124...