
33
Connecting the Z5018 to the Z5017 and LCR Meter
3
3.3 Connecting the Z5018 to the Z5017 and LCR
Meter
1
Connect the H
CUR
, H
POT
, L
CUR
, and L
POT
BNC plugs of the Z5018 Switch Box to
the corresponding terminals of the LCR
meter.
Black
Red
Red
Black
2
Connect the control terminals for Z5018
to the Z5018 connection terminals of the
Z5017 PLC Rack.
Control terminal cable
color
External I/O
terminal
White, black
24 V
Red, green
GND
Yellow
Not connected
Brown
SCN
Blue
O/S
Summary of Contents for TS2400
Page 2: ......
Page 16: ...12 Product Overview ...
Page 34: ...30 Model Z5018 Switch Box ...
Page 74: ...70 Connecting the Measuring Instrument and a Workpiece ...
Page 82: ...78 Automatic measurement ...
Page 112: ...Appx 2 ...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......