
13
2
Preparation for Measurements
Make sure to read through both “Usage Notes” (p. 5) in this manual and the separate “Operating
Precautions” before starting the preparations that precede measuring.
For rack mounts, see “15.3 Rack Mount” (p. 224).
Installing the device.
Connecting the test lead.
Connecting and setting the external interface (as necessary).
EXT. I/O
RS-232C
GP-IB
USB
LAN
USB memory
Connecting the power cord.
Turning on the instrument power supply.
Setting the date and time (as necessary).
Setting the measuring mode.
Inspecting before measurement and verifying operations.
2
Preparation for Measurements
2
Preparation for Measurements
Summary of Contents for ST4030
Page 2: ......
Page 14: ...6 Usage Notes ...
Page 32: ...24 Inspecting before Measurement and Verifying Operations ...
Page 42: ...34 Table Copying ...
Page 108: ...100 Setting Dielectric Break down Judgment Conditions ...
Page 132: ...124 Terminal Open Error Setting ...
Page 198: ...190 Editing Files and Folders ...
Page 214: ...206 Interface Specifications ...
Page 248: ...240 Precautions when Processing Test Leads ...
Page 252: ...244 Index ...
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......