31
2
Measurement Preparations
2.1 Preparation Flowchart
Before preparing for measurement, be sure to read “Operating Precautions” (p. 12).
Refer to “Appx. 9 Attaching Rack-mounting Hardware to the Instrument” (p. Appx.12) for rack mount
-
ing.
(1) Installing the Instrument (p. 12)
(2) Connecting the Power Cord (p. 34)
(3)
Connect measurement cables, optional Hioki probes or test fixture to the measurement
connectors (p. 35)
Check that the instrument’s power switch is turned
off.
(4) Connect the external interface (as needed)
For more information about making RS-232C, GP-IB, USB, and LAN connections, see the Com
-
munications Instruction Manual on the bundled LCR Application Disc.
External interface
RS-232C
GP-IB
USB
LAN
(5) Turning Power On (p. 36)
2 Measurement Preparations
2
Measurement Preparations
Summary of Contents for IM3536
Page 20: ...16 Operating Precautions ...
Page 34: ...30 Screen Layout and Operation ...
Page 140: ...136 Testing the System Self diagnosis ...
Page 224: ...220 About Measurement Times and Measurement Speed ...
Page 240: ...236 Discarding the Instrument ...