1.3 Measurement Flowchart
19
1
1
Initial instrument preparations
Apply the appropriate label to the input terminals (p. 37)
Apply the appropriate labels to the voltage measurement and clamp sensor leads
(p. 38)
Install the 9459 Battery Pack (p. 39), and charte it (p. 40).
2
Install and connect the instrument, and turn the power on
Install this instrument
1
Refer to "5.1 Pre-Operation Inspection" (p. 79)
before using the instrument.
3
Connect the required clamp
sensors to the current input
terminals (p. 44).
To use a computer
Connect the USB cable to the
USB port on the instrument.
Connect the power cord.
(p. 41)
1. Connect power cord to the
AC adapter.
2. Plug the AC adapter into
the instrument.
3. Connect the power cord to
a power outlet.
4
2
Connect the required
measurement leads to
the voltage input termi-
nals (p. 42).
Turn the power on
OFF
ON
The POWER LED flashes.
5
3
Other preparations
Select another display language (p. 47)
Select the screen color scheme to match the input terminal labels (p. 48)
Select the naming convention to be applied to each phase line measurement on
the display (p. 49)
Summary of Contents for 3197
Page 1: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...
Page 2: ......
Page 8: ...Contents vi ...
Page 30: ...1 3 Measurement Flowchart 22 ...
Page 44: ...2 5 Internal Operating Status and Memory Usage 36 ...
Page 86: ...4 6 Initializing the Instrument System Reset 78 ...
Page 134: ...6 4 Viewing Recorded Data REVIEW State 126 ...
Page 176: ...9 4 Disposing of the Instrument 168 ...
Page 199: ......
Page 200: ...3197 POWER QUALITY ANALYZER May 2012 Revised edition 7 3197A981 07 12 05H Instruction Manual ...