150
4/2018
113175421
XR14S/16S/18S/21S/26S/30S
Hooklift Multilift XR S
Service Manual
Periodical Service
The following services are recommended to be done on XR devices by an authorised
Multilift Service Point:
• delivery service in connection with the commissioning of the device
• first service after 1 - 3 months after commissioning
• annual service:
at 12 months interval in normal use (0 -15 platform changes a day)
at 6 months interval in 2-shift use (16 – 30 platform changes a day)
at 3 months interval in 3-shift use (over 30 platform changes a day)
As running hours the service should be done at 180 – 200 hours interval.
Environmental notice
Appropriate disposal of used oils, lubricants, discarded parts and other used
material.
Recycling after service life
When a device is discarded, all of its components shall be recycled and
disposed of in accordance with valid decrees and regulations.
Summary of Contents for Hooklift Multilift XR S Series
Page 157: ......