
86
9.2 Staking out
Staking out is to find the earth point needed when
designing. The common process to stake out is as followed:
1. Select a file for staking out to access to and transfer
coordinate of STA and BBS and data of staking-out point etc.
2. Setup STA
3. Setup BBS
4. Enter the staking out coordinate and start staking-out.
The Menu for staking out is as followed:
The „Setup Station‟ and „Orientation (BBS)‟ are the
preparation work for staking out. If users have already setup
station and orientation of BBS, re-setting them are not
necessary.