To replace the drive, reverse the removal procedure.
HPE Smart Array controller installation guidelines
• Make sure that mezzanine cards are installed in server mezzanine slots that map to the selected Synergy frame
interconnect bay.
• For the Synergy 480 compute module, it must occupy mezzanine slot 1.
• For the Synergy 660 compute module, it must occupy mezzanine slot 1 or mezzanine slot 4.
IMPORTANT: For more information about the association between the mezzanine bay and the interconnect bays,
see the HPE Synergy 12000 Frame Setup and Installation Guide in the Hewlett Packard Enterprise Information
Library (
http://www.hpe.com/info/synergy-docs). Where you install the mezzanine card determines where to
install the interconnect modules.
Installing Smart Array controller
Procedure
1.
Power down the compute module.
2.
Remove the compute module.
3.
Place the compute module on a flat, level work surface.
4.
Remove the access panel.
5.
Locate the appropriate mezzanine connector. To locate the connector, see "
P542D controller ports and connectors" or
P416ie-m controller ports and connectors."
6.
Remove the front panel/drive cage assembly.
7.
Remove the mezzanine connector cover, if installed.
8.
Install the mezzanine card. Press firmly on the
PRESS HERE label above the mezzanine connector to seat the card.
28 Deployment
Summary of Contents for Smart Array P416ie-m SR Gen10 Controller
Page 33: ...Deployment 33 ...
Page 46: ...46 Deployment ...
Page 49: ...Deployment 49 ...
Page 52: ...52 Deployment ...
Page 72: ...voltage regulator module VSA virtual storage appliance 72 Acronyms and abbreviations ...