![Hewlett Packard Enterprise ProLiant ML350 Gen10 User Manual Download Page 99](http://html.mh-extra.com/html/hewlett-packard-enterprise/proliant-ml350-gen10/proliant-ml350-gen10_user-manual_2128084099.webp)
8 SFF hot-plug drive cage option
The server supports the 8 SFF hot-plug drive cage option. This option:
• Can be installed in boxes 1–3.
• Can be installed together with the 4 LFF hot-plug or 8 NVMe SSD Express Bay drive cage options.
• Supports SATA or SAS drives depending on the storage controller used.
Kit contents
• 8 SFF hot-plug drive cage
• SFF drive blanks (8, preinstalled in the drive cage)
• Drive power cable
• T-15 Torx screws (4)
Installing the 8 SFF hot-plug drive cage
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Drive cage option kit
•
Storage controller cable option
• SFF hot-plug drive option
• T-15 Torx screwdriver
Procedure
1.
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Position the tower server for hardware configuration.
• Server in rack mode:
Extend the server from the rack.
6.
7.
8.
If installed,
Hardware options installation
99
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...