3. Install the fan cage:
a. Align the fan cage with its chassis brackets.
b. Close the latches until they click into place.
4. Perform the post-installation/maintenance steps required by the procedure that required the removal of the fan cage.
Remove the half-height media bay blank
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
While pressing the latch on the media bay blank, pull out the blank from the bay.
48
Operations
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...