![Hewlett Packard Enterprise HPE ProLiant DL385 Gen10 Plus Maintenance And Service Manual Download Page 45](http://html1.mh-extra.com/html/hewlett-packard-enterprise/hpe-proliant-dl385-gen10-plus/hpe-proliant-dl385-gen10-plus_maintenance-and-service-manual_2128064045.webp)
Procedure
2. Extend the server from the rack.
3. Open or unlock the locking latch, slide the access panel to the rear of the chassis, and remove the access panel.
Removing the air baffle
CAUTION: Do not detach the cable that connects the battery pack to the cache module. Detaching the cable causes any
unsaved data in the cache module to be lost.
CAUTION: For proper cooling, do not operate the server without the access panel, baffles, expansion slot covers, or
blanks installed. If the server supports hot-plug components, minimize the amount of time the access panel is open.
Procedure
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
5. Remove the air baffle.
Removal and replacement procedures
45