
System
6
13
6
SYSTEM
6.1
Section pelletfire
1. T-Control
(central control unit)
2. Efficient heat insulation
for the lowest radiation losses
3. High heat resistant stainless steel combustion chamber
4. Automatic ignition
5. Automatic tipping grate at the pellet burner
for complete cleaning
6. Combustion ash box from
easy access from the front
7. ID-fan
speed controlled and monitored for the highest operating safety
8. Lambda probe control
automatic flue gas and combustion monitoring
9. Pipe heat exchanger
with turbulators and automatic cleaning
10. Certified back fire protection flap (BFP)
1
2
3
4
5
6
7
8
9
10
Summary of Contents for pelletfire 20/20
Page 1: ...OPERATING INSTRUCTIONS Log wood pellet heating system pelletfire 20 40 ...
Page 90: ...15 Annex 90 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 91: ...Annex 15 91 Hydraulic recommendation 2 ...
Page 92: ...15 Annex 92 15 2 Solar module Program 1 ...
Page 93: ...Annex 15 93 Program 2 ...
Page 94: ...15 Annex 94 Program 3 ...
Page 95: ...Annex 15 95 Program 4 ...
Page 96: ...15 Annex 96 Program 5 ...
Page 97: ...Annex 15 97 Program 6 ...
Page 98: ...16 Notes 98 16 NOTES ...
Page 99: ...Notes 16 99 ...