11
Maintenance schedule
74
11
MAINTENANCE SCHEDULE
(Some points have also been prescribed in accordance with TGPF 118 H!) -
For safety reasons, maintenance must only be carried out with the main switch
turned off. However, first of all, the system must be switched off by means of the
On/Off button and you must wait for the burnout phase. If you have to climb into
the storage tank or bunker, always make sure that there is a second person
available to supervise you.
Potential carbon monoxide enrichment may put your life in danger.
11.1
Weekly Inspection
Item
Procedure
Total system
Check the whole boiler system (1)
including the fuel storage room (2)
visually for damages and wear. Repair
discovered faults immediately.
Extinguisher
container
Check extinguisher container filling level
and refill if necessary. If re-filling occurs
frequently, contact your contracting party.
11.2
Monthly inspection
Item
Procedure
Pivoting grate
Burning chamber
Disassemble the ash container handle,
open the panel door and dismantle or
open the combustion chamber door (1)
1
1
2
Summary of Contents for firematic CONDENSATION 30
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Page 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Page 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Page 86: ...15 Annex 86 Program 2 ...
Page 87: ...Annex 15 87 Program 3 ...
Page 88: ...15 Annex 88 Program 4 ...
Page 89: ...Annex 15 89 Program 5 ...
Page 90: ...15 Annex 90 Program 6 ...
Page 91: ...Notes 16 91 16 NOTES ...