The handling and menu navigation are described in this chapter. Every single T-CONTROL parameter is
explained in chapter 9.11.
figure 9. 1: T-CONTROL
9.1
Starting the system
To switch on the display, two conditions must be fulfilled:
◼
The boiler must be connected to the power supply (see figure below)
◼
The main switch (2) on the boiler front must be switched on
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
1… cable entry (panel backside)
2…main switch (Front door)
3…power supply (panel backside)
Summary of Contents for firematic CONDENSATION 30
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Page 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Page 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Page 86: ...15 Annex 86 Program 2 ...
Page 87: ...Annex 15 87 Program 3 ...
Page 88: ...15 Annex 88 Program 4 ...
Page 89: ...Annex 15 89 Program 5 ...
Page 90: ...15 Annex 90 Program 6 ...
Page 91: ...Notes 16 91 16 NOTES ...