![Henny Penny LVE-202 Technical Manual Download Page 37](http://html1.mh-extra.com/html/henny-penny/lve-202/lve-202_technical-manual_2124358037.webp)
25
5
5..2
2..8
8 S
SP
P--8
8 E
Ed
diitt U
Un
niitt S
Se
erriia
all N
Nu
um
mb
be
err
1
1))
Press the down arrow and “SP-8 S/N ✓EDIT” shows in left display. Press the
right ✓ button to enter the unit’s serial number in the controls using the product
buttons. “STD” and “CUST” show in the right display. Press the ✓ button under
the “STD” and the first 2 letters of the serial number is the standard equipment
code, press the “X” button and a custom equipment code can be entered.
NOTE: This serial number should match the serial number on the data plate,
located on the door.
5
5..2
2..9
9 S
SP
P--9
9 D
De
ecca
all L
La
ayyo
ou
utt
1
1))
Press the down arrow and “SP-9 DECAL LAYOUT?” scrolls in the left display.
The words in the right displays should match the arrow type above the temp and
info buttons. For example, if the control decal shows down-up, the right display
should show “DOWN-UP”. If the display shows “UP-DOWN”, use the left and
right arrows to change the displays to “DOWN-UP”.
5
5..2
2..1
10
0 S
SP
P--1
11
1 M
Me
elltt C
Cyycclle
e S
Se
elle
ecctt
1
1))
Press the down arrow and “SP-11 MELT CYCLE SELECT” scrolls in the left
display. Unless solid oil is being used in the vats, the right display should show
“1.LIQUID”. If solid oil is used, the unit must be equipped to handle solid oil. Use
the left and right arrows to change the right display to “2.SOLID”.
5
5..2
2..1
11
1 S
SP
P--1
12
2 C
Ch
ha
an
ng
ge
e P
Pa
ad
d R
Re
em
miin
nd
de
err T
Tiim
me
e
1
1))
Press the down arrow and “SP-12 ‘CHANGE PAD’ REMINDER” shows on the
display. Use the product buttons to change the time between changing the filter
pad reminders. For example, if “25 HRS is programmed in the right display,
every 25 hours, the display shows “CHANGE PAD” as a reminder to the
operator that the filter pad needs changed.
5
5..2
2..1
12
2 S
SP
P--1
13
3 P
Pa
an
n O
Ou
utt O
Off F
Frryye
err =
= P
Pa
ad
d C
Ch
ha
an
ng
ge
ed
d
Press the down button and “SP-13 PAN OUT = CHANGED PAD” scrolls in the left
display. Use the product buttons to program the amount of time the drain pan is pulled
out from under the fryer before the controls reset the change pad reminder. This is the
amount of time it should take to change filter pad. Range is 15 to 255 seconds. For
example, if “120 SEC” is programmed in the right display, when the drain pan is out
form under the fryer for at least 120 seconds, the control restarts counting for the
change pad reminder.
5
5..2
2..1
13
3 S
SP
P--1
14
4 A
Au
utto
o--F
Fiillll E
En
na
ab
blle
ed
d
1
1))
Press the down arrow and “SP-14 AUTO-FILL ENABLED?” scrolls in the left
display. Use the left and right arrows to set the right display to “YES” or “NO”.
This should always be set to “YES” unless a hardware failure causes a problem,
such as a JIB pump or Add Oil valve failure.
5
5..3
3 C
Cllo
occkk S
Se
ett
1
1))
Press and hold the temp and info button until “LEVEL - 3” shows in the display,
followed by “ENTER CODE”.
2
2))
Enter code 1, 1, 2, 2, 1, 1, 2, 2 (first two product buttons).
3
3))
“A. TECH” “RESETS” shows in the display. Press the down arrow twice and “C.
CLOCK” “SET” shows in the display.
Summary of Contents for LVE-202
Page 2: ......
Page 6: ...Contents iv...
Page 8: ...Preface vi...
Page 24: ...Info Filter Temp Button Stats 12...
Page 32: ...Level 2 Programming 20...
Page 50: ...Maintenance 38 NOTE Oil temp must be 380 F 193 C to perform this check...
Page 88: ...Maintenance 76...
Page 90: ......
Page 91: ......
Page 92: ...Wiring Diagrams 155...
Page 93: ...Wiring Diagrams 156...
Page 94: ...Wiring Diagrams 157...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ...Wiring Diagrams 161...
Page 99: ...Wiring Diagrams 162...
Page 100: ...Wiring Diagrams 163...
Page 101: ...Wiring Diagrams 164...
Page 102: ...Wiring Diagrams 165...
Page 103: ...Wiring Diagrams 166...
Page 104: ...Wiring Diagrams 167...
Page 105: ...Wiring Diagrams 168...
Page 106: ...Wiring Diagrams 169...
Page 107: ...Wiring Diagrams 170...
Page 108: ...Wiring Diagrams 171...
Page 109: ...Wiring Diagrams 172...
Page 111: ...Wiring Diagrams 174...
Page 112: ...Wiring Diagrams 175 Figure 10 1 Plumbing Diagram...
Page 113: ...Wiring Diagrams 176...
Page 114: ...blank page...