background image

INSTALLATION OF SAUNA ROOM BODY 

1. Place the floor panel in the desired location on a level surface (Note: The floor panel must be 

level before installing wall and ceiling panels. If the surface is not level you may need to 
shim the bottom panel to get level.) 

   

  Tile on the floor should be to the front of the room. 

 

 

 

2. Place back panel in the slot of floor panel. 

 

3. Place the left side panel in the slot of floor panel. 

 

 

4. Place the right side panel in the slot of floor panel. 

IG 630-EX/E300-X-3                                

 5                                           

09/18/09 

Summary of Contents for IG-630 E300-X

Page 1: ...A N D T R I C K S 1 P R E C A U T I O N S F O R U S E 2 PA RT S N A M E S 3 R E A D B E F O R E I NS TA L L AT I O N 4 INSTALLATION OF SAUNA ROOM BODY 5 8 INSTALLATION OF MAGAZINE RACK 9 CONTROL PANEL...

Page 2: ...rface Supply voltage should be a nominal of 120 volts AC House wiring gauge size should match the amperage of the product being used Keep the length of wiring run from the breaker panel to your sauna...

Page 3: ...0 4427 or email the Service Center at techsupport saunatec com WARNING If you have any health problem or condition consult your physician for permission to use the sauna room health problem includes b...

Page 4: ...PARTS NAMES Vent IG 630 EX E300 X 3 3 09 18 09...

Page 5: ...than the panel with the pin Refer to Picture 1 place the slot panel against the panel with pin Refer to Picture 2 and then slide down the panel until the two panels are equal in height Refer to Pictu...

Page 6: ...ling wall and ceiling panels If the surface is not level you may need to shim the bottom panel to get level Tile on the floor should be to the front of the room 2 Place back panel in the slot of floor...

Page 7: ...sponding grooves of the wooden supports Refer to picture 1 Connect the power connector from the back of Bench Support Panel Panel Ensure the connection is completely fastened Refer to picture 2 Place...

Page 8: ...the connection wires from the three side panels protrude through the corresponding holes of the top panel Make sure the top panel s arched side is facing to the front Make sure the wire is through eac...

Page 9: ...ord into electrical outlet before connecting the plugs 9 Connect the power connector according to following 3 pictures before plug in 10 The power cord is located at the bottom of the back panel Simpl...

Page 10: ...INSTALLATION OF MAGAZINE RACK IG 630 EX E300 X 3 9 09 18 09...

Page 11: ...ntrol of the set temperature and also indicates the actual temperature inside sauna room C F refer to the switching of C and F Once the control is turned on the indicated temperature of use defaults t...

Page 12: ...f if Power is turned OFF WARNINGS AND SUGGESTIONS FOR USE Please read carefully the following warnings to reduce the risk of burns fire electric shock or injury to persons Do not put the sauna room in...

Page 13: ...cted for consistency color and quality Our rooms are shipped around the globe and can experience slight blemishes scratches or scuffs from the transit of this sauna In most cases these blemishes on th...

Page 14: ...IG 630 EX E300 X 3 13 09 18 09...

Page 15: ...IG 630 EX E300 X 3 14 09 18 09...

Reviews: