3. Installation
HELIOS CUBE BS4850-SH
User Manual
16
Helios New Energy Technology (Australia) Pty Ltd
➢
Install the product in a sheltered place or install an awning over the product
➢
Keep the environment temperature under 50
℃
.
➢
The floor should be flat, solid and level.
➢
Do not cover or wrap the battery cabinet.
3.4
I
NSTALLATION
C
LEARANCE
➢
Reserve enough clearance around the product to ensure sufficient space for installation and heat
dissipation as shown Figure 3-1.
➢
Install the product vertically on a solid and flat floor.
➢
Do not install the product at forward tilted, excessive back tilted, side tilted, horizontal, or up-side-down
positions.
Figure 3-1 Installation clearance
3.5
I
NSTALLATION
P
ROCEDURE
Step 1
Position the battery cabinet at the right place according to Section 3.4