Installation | Overview
5
5.1
Overview
This chapter describes the Installation of the product. It contains information about
the product's connections and instructions about how to correctly connect the
peripheral devices.
The following steps must be performed only by qualified personnel.
"Personnel qualification", Page 25
5.2
General information
NOTICE
Interference from sources of high electromagnetic emission!
Peripheral devices, such as frequency inverters or servo drives, may cause
interference.
To increase the noise immunity to electromagnetic influences:
Use the optional functional ground connection as per IEC/EN 60204-1
Use only USB peripherals with continuous shielding, e.g. by metalized film
and metal braiding or a metal housing. The degree of coverage provided by
the braiding must be 85 % or higher. The shield must be connected around
the entire circumference of the connectors (360° connection).
NOTICE
Damage to the device from the engaging and disengaging of connecting
elements during operation!
Damage to internal components may result.
Do not engage or disengage any connecting elements while the unit is under
power
NOTICE
Electrostatic discharge (ESD)!
This device contains electrostatic sensitive components that can be destroyed
by electrostatic discharge (ESD).
It is essential to observe the safety precautions for handling ESD-sensitive
components
Never touch connector pins without ensuring proper grounding
Wear a grounded ESD wristband when handling device connections
42
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...