Settings |
Axes
Parameter
Explanation
Spacing of the supporting points
Spacing of the compensation points on the axes (
X
and
Y
)
Setting range:
0.00001 mm ... 100.00000 mm
(
X
and
Y
)
Default value:
1.00000 mm
(
X
and
Y
)
Read deviations of calibration
standard
A file containing the deviations of the calibration standard is read
Import table of supporting points
Uploading a file
in .txt-format with position information regarding the
supporting points
in .xml format with position information regarding the
supporting points and the deviations of the calibration
standard
Export table of supporting points
A file containing the position indications of the supporting points
and the deviations of the calibration standard is saved
Table of supporting points
Opens the table of supporting points for manual editing
11.6.5
Squareness error compensation (SEC)
Path:
Settings
►
Axes
►
General settings
►
Error compensation
►
Squareness error compensation (SEC)
Parameter
Explanation
XY plane
XZ Plane
YZ plane
Mechanical influences on the squareness of the axes relative to
each other are compensated
Setting range:
85° ... 95°
Default value:
90
11.6.6
Alias assignment for axis names
Path:
Settings
►
Axes
►
General settings
►
Alias assignment for axis names
You can assign new axis names for the following axes: C1, C2, and C3. The
respective axis name is a two-digit numerical value, a two-character combination of
letters, or a two-character combination of a numerical value and a letter.
Parameter
Explanation
C1
C2
C3
Setting range:
00 ... 99
and
aA ... xX
Default value:
X
(for C1)
Default value:
Y
(for C2)
Default value:
Z
(for C3)
11
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
195
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...