Measuring | Conducting a measurement
Fixing the measured object in place
The measured object must be fixed in place on the measuring plate or in an
appropriate holder, depending on its size.
Position the measured object in the center of the measuring range
Use e.g. modeling clay to fix small measured objects in position
Use fixtures to fix large measured objects in position
Make sure that the measured object is fastened neither too loosely nor too
tightly
Conducting the reference mark search
With the help of reference marks, the unit can assign axis positions of the encoder
to the machine.
If no reference marks for the encoder are provided by a defined coordinate system,
you need to perform a reference mark search before you start measuring.
If the reference mark search after unit start is active, then all of the
unit’s functions will be disabled until the reference mark search has
been successfully completed.
"Reference marks (Encoder)", Page 201
The reference mark search does not need to be performed for serial
encoders with EnDat interface, because the axes are automatically
homed.
If the reference mark search is active on the unit, then a wizard will ask you to
traverse the reference marks of the axes.
After logging in, follow the instructions of the wizard
The Reference symbol stops blinking upon successful completion of the
reference mark search
"Operating elements of the position display", Page 66
"Activating the reference mark search", Page 113
Starting the reference mark search manually
A manual reference mark search can be performed only by the
Setup
and
OEM
user types.
If the reference mark search was not performed on startup, you can start it
manually later.
Tap
Settings
in the main menu
Open in the sequence
Axes
General settings
Reference marks
Tap
Start
The Reference symbol blinks
Follow the instructions of the wizard
The Reference symbol stops blinking upon successful
completion of the reference mark search
9
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
157
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...