
Gas fired igniter ZA0 / ZDA0
Installation and initial commissioning
- 32 -
Status: 11-2018
6.2
Installation and electrical connection
Ensure that the following tasks are only performed by suitably
trained personnel.
DANGER!
Danger to life due to electrical current!
When touching with current conducting parts, there
is a danger to life.
– Only pull out or unplug the connecting plug or
connector, when the operating current of the
gas fired igniter is switched off.
NOTICE!
- Before connection, check whether the gas fired
igniter is suitable for the mains voltage provided.
- The installer/operator is responsible for the
installation of the gas fired igniter into a system,
which fulfils the stated system specific standards
and guidelines.
- The operator/installer is responsible for
adherence to the permitted environmental
conditions and/or ambient atmosphere, in
accordance with the technical data.
1.
Prepare the installation location and installation opening.
From an outer tube length of 3 m observe the following:
– Use a guide tube to prevent sagging of the outer tube.
– The end of the outer tube must project 30 – 80 mm over
the guide tube.
– The annular gap between the outer tube and the guide
tube must be 5
– 15 mm.