Gas fired igniter ZA0 / ZDA0
Installation and initial commissioning
- 30 -
Status: 11-2018
6
Installation and initial commissioning
6.1
Safety
Personnel
Installation may only be performed by suitably qualified
specialist staff of the plant installer.
Initial commissioning may only be performed by employees of
the manufacturer or by trained personnel.
Basics
WARNING!
Danger of injury due to faulty installation and
initial commissioning!
Errors during installation and initial commissioning
can result in potentially fatal situations or entail
substantial material damage.
– Prior to any commissioning/maintenance work
that part of the plant where the gas fired igniter
is installed must be switched off and secured
against accidental restart. All feedlines to the
gas fired igniter must be blocked, emptied and
cleaned, if necessary.
– Before starting work, ensure that there is
sufficient freedom of movement for the
installation work.
– Take care when handling open, sharp-edged
components.
– Ensure that the installation site is clean and
tidy. Loose components and tools lying around
or piled on top of each other are a possible
cause of accidents.
– Assemble components professionally and
correctly, observing prescribed screw tightening
torque levels.
– Secure components so that they cannot drop
down or fall over.