Heatcraft Refrigeration Products 25001501 Installation & Operating Instructions Manual Download Page 6

BEACON CONTROLLER

6

ROOM TEMPERATURE CONTROL (Cont’d.)

Another method of setting the room set-point is to use the Beacon board thermostat pot. If a value other
than that available by using a fixed resistor is required, the pot on the Beacon board can be used. First,
you must discard the fixed resistor. Then, using a digital ohmmeter, measure the resistance between the
“X” and “200K” as indicated in the illustration below. Use a screwdriver to turn the thermostat pot until the
resistance value is obtained for the desired room temperature (according to Table 1). Install the jumper
(supplied in the bag) across the terminal marked “X” when finished.

TABLE 1

Carbon Film Fixed Resistor selections that will control the room temperature at the approximate temperatures
shown.  These values are also to be used for setting the Beacon board thermostat.

The Beacon Smart Controller.  See Beacon Smart Controller Installation & Operating Instructions (Part
#25004101) for more details.

Application

Temperature 

°

F

*Ohms

Low Temperature

-25

182K

   Electric Defrost

-20

150K

-15

120K

-10

100K

-5

85K

0

70K

Medium Temperature

20

30K

   Electric Defrost

25

25K

30

20K

Medium Temperature

35

15K

   Air Defrost

40

10K

45

8K

50

5K

55

2K

60

0K

Summary of Contents for 25001501

Page 1: ...2175 West Park Place Blvd Stone Mountain GA 30087 770 465 5600 Fax 770 465 5990 INSTALLATION OPERATING INSTRUCTIONS FOR 02 01 Part Number 25001501...

Page 2: ...n of master Start Up After system evacuation add correct refrigerant It may be necessary to adjust time delay relay TDR to 10 minutes temporarily to allow system charging Readjust TDR back to 2 minute...

Page 3: ...0 F may need to addd pressure fan cycling switch System flashes superheat sensor shorted or open Change evap in and evap out sensors System flashes room temp sensor discharge sensor defrost terminatio...

Page 4: ...crankcase heater to be energized 24 hours prior to start up the Beacon should be de energized for this period by disconnecting the 24V lead to the condensing unit terminal block To start the system th...

Page 5: ...Slave unit s if used Connect the multi out terminal on the master unit to the multi in terminal on slave unit and the 24V 18 to 30 VAC from the master unit to the slave unit See wiring diagram Alarm c...

Page 6: ...ed for the desired room temperature according to Table 1 Install the jumper supplied in the bag across the terminal marked X when finished TABLE 1 Carbon Film Fixed Resistor selections that will contr...

Page 7: ...o check board for proper function Type 2 or type 1 Are not used Do not select Reset time or normal Resets all internal timers back to zero as though the unit was just powered up Keep jumper on normal...

Page 8: ...ts and the electric expansion valve EEV stays closed for 12 seconds After 12 seconds the EEV goes to approximately half open and the compressor is put in a four minute hold on cycle This means that th...

Page 9: ...he compressor and the evaporator fans will be in a four minute hold off cycle and will not start immediately When there is a call for cooling the compressor starts and the electric expansion valve EEV...

Page 10: ...nately By using a volt meter to measure the DC volts across the pins marked EXV TEST bare pins near LED on the Beacon board a determination can be made if the valve is open or closed This must be meas...

Page 11: ...When the Beacon is energized the alarm contacts are OPENED When an alarm condition is de tected the contacts are CLOSED Conditions under which the alarm contacts will close are Power failure on or to...

Page 12: ...fans while loading the freezer or cooler box This may cause the evaporator coil to freeze up The compressor can be de energized when the evaporator fan is de energized by wiring a 24V AC coil double p...

Page 13: ...d low temperature limits for alarm Alarm conditions time limits Medium temperature or low temperature system F or C Set the clock Run a quick test of the system Other features of the Smart Controller...

Page 14: ...F 8 F X 8 F X 12 F 12 F DEFROST FAIL SAFE DEFROST FAIL SAFE 10 MIN 10 MIN 20 MIN 20 MIN 30 MIN X 30 MIN 40 MIN 40 MIN X 60 MIN 60 MIN MEDIUM X LOW MEDIUM X LOW TEST X NORM TEST X NORM TYPE 1 TYPE 2 T...

Page 15: ...trol Board for Electric Defrost 28910001 Control Board for Air Defrost 28910002 Terminal Block 2251266 Low Pressure Switch Time Delay Relay 22536801 Electric Expansion Valve ESV 1 24 volt 29310001 ESV...

Page 16: ...e 30 VAC 3 Check if expansion valve is correctly wired on Beacon board 4 Check EVAP IN EVAP OUT sensors for proper operation 5 Is EEV wired properly 6 Is system charged properly 7 Check fan cycling op...

Page 17: ...copper tubing 6 If system has Smart Controller check MULTI IN MULTI OUT connection at board at Smart Controller to make sure wires are not reversed 7 Check if ROOM sensor is connected on Beacon board...

Page 18: ...Com 24 Vdc Notes 1 All volts shown are measured while in the TEST mode and are DC 2 The volts shown for each step BLUE RED WHT BLK are measured between the YEL Com the corresponding pin 3 The volts sh...

Page 19: ...to low superheat check tripping compressor EVAP IN EVAP OUT sensors check refrigerant charge Superheat light indicates 1 Incorrect refrigerant charge 1 Check refrigerant charge 1 deg then 8 deg 2 Exp...

Page 20: ...lems 8 Check motor for open circuit short circuit grounded windings or burn out 9 Loose wiring 9 Check all wire terminals tighten if necessary Compressor noisy or 1 Flooding of liquid refrigerant into...

Page 21: ...il sight glass is 1 2 full pressure 2 Compressor short cycling 2 Check low pressure control settings 3 Excessive liquid refrigerant in 3 Check crankcase heater check expansion valve compressor crankca...

Page 22: ...BEACON CONTROLLER 22...

Page 23: ...BEACON CONTROLLER 23...

Page 24: ...BEACON CONTROLLER 24...

Page 25: ...BEACON CONTROLLER 25...

Page 26: ...BEACON CONTROLLER 26...

Page 27: ...BEACON CONTROLLER 27...

Page 28: ...BEACON CONTROLLER 28...

Page 29: ...BEACON CONTROLLER 29...

Page 30: ...BEACON CONTROLLER 30...

Page 31: ...BEACON CONTROLLER 31...

Page 32: ...BEACON CONTROLLER 32...

Page 33: ...BEACON CONTROLLER 33...

Page 34: ...BEACON CONTROLLER 34...

Page 35: ...BEACON CONTROLLER 35 Notes...

Page 36: ...for Technical Literature Online Since product improvement is a continuing effort at Heatcraft we reserve the right to make changes in specifications without notice 2175 West Park Place Blvd Stone Moun...

Reviews: