12
139-3/4"
(255 cm)
138"
(350,5 cm)
Flush
Flush at corner
3/8" Flat Washer
3/8" Lock Washer
3/8" x 4 1/2" Lag Bolt (11,4 cm)
Flush
Pre-drill Post
Flip
Flip
NOTE:
Angle position
FINISH
6
2
Arrange parts as shown on a level surface. Both post assemblies should
be approximately parallel and ush at each end.
SIDE WALL ASSEMBLY
PARTS REQUIRED:
Place Side Header assembly on top of post and ush at corner
(Fig. A)
.
Repeat
steps 1-5
to assemble second side.
Secure header to corner posts using two 4-1/2" Lag bolts
(Fig. A)
.
With some assistance carefully ip post and header over to work on opposite side.
Square and Pre-drill two holes in post 1/4" x 2-1/2" DEEP through header's
pre-drilled holes as shown.
3
4
5
1
BEGIN
x2
Fig. A
x8
x8
x8
1/4" (0,6 cm)
Drill Bit
Lock Washer
Flat Washer
4-1/2"
Lag Bolts
90°
90°