
17
Install the left panel 1-1/2"
from the top plate.
Use a 2x3 spacer for
consistent measurement.
Secure panel with 2"
nails spaced 6" apart on
edges.
Install the right panel flush
to installed panel,
as shown.
Ensure 64" (162,8 cm) door
measurement.
Use part
OO
as a
temporary brace. Secure
with with (2) 3" screws.
Secure panels with 2" nails
spaced 6" apart on edges.
2x3
2x3
2x3
PARTS REQUIRED:
GABLE WALL 01 WITH DOOR
2" (5,1 cm)
x150
x1
x1
6"
(15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush
Flush
OO Temporary Brace
3" (7,6 cm)
x2
4
3
64"
(162,6 cm)
3"
(7,6 cm)
Screw
3"
(7,6 cm)
Screw
3/4"
(1,9 cm)
x1
69" (75,3 cm) Door Stiffener
OO
Temporary Brace
Install (2)
11-7/8" x 84"
panels flush to installed
panels and 1-1/2" from
the top plate.
Secure panels with 2"
nails spaced 6" apart on
edges.
Note the panel
lip-edge/square edge
orientation.
Flush
Flush
Flush
Flush
5
Your 10' WALL 01 is now
assembled.
Carefully flip the wall over.
FINISH
LIP EDGE
11-7/8"
(30,2 cm)
SQUARE
EDGE
11-7/8" x 84"
(30,2 x 213,4 cm)
x2
1-1/2"
(3,8 cm)
6"
(15,2 cm)
3/4" Gauge
Block
3/4" Gauge
Block
Flush