
Revision: 05/21/19
Page: 1 of 6
©HearthStone Quality Home Heating Products, Inc.
Http://www.hearthstonestoves.com
Technical Data Sheet
Green Mountain 80 Refractory Stone and Baffle Installation
Instructions
INCLUDED IN KIT:
TOOLS REQUIRED:
(2) 1-0600-800 Rear Refractory Stone
7/16” Wrench
(1) 1-0600-801 Right Refractory Stone
(1) 1-0600-802 Left Refractory Stone
(1) 3070-023 Rear Insulation Panel
(2) 3070-026 Vermiculite Baffle
(1) 5680-002 Bottom Heatshield
(1) 5680-010 Secondary Air Riser/Pipe
(1) 5680-014 Baffle Guard
(1) 5860-018 Secondary Air Deflector
Before You Begin:
These components must be correctly installed prior to using this
appliance. Completely read instructions before attempting this installation.
Procedure:
1) Place rear insulation panel against the center of the rear casting, along with the
left side rear refractory stone.
Photo 1. Insulation panel placed behind left rear refractory stone.