HearthStone Green Mountain 80 Technical Data Sheet Download Page 1

 

 

Revision:  05/21/19 
Page: 1 of  6 

©HearthStone Quality Home Heating Products, Inc. 

Http://www.hearthstonestoves.com

 

 

 

Technical Data Sheet 

 

Green Mountain 80 Refractory Stone and Baffle Installation 

Instructions

 

 

 

 

 

INCLUDED IN KIT: 

 

 

TOOLS REQUIRED: 

 
(2) 1-0600-800 Rear Refractory Stone                 

 

 

7/16” Wrench 

(1) 1-0600-801 Right Refractory Stone 

 

 

 

(1) 1-0600-802 Left Refractory Stone  

 

 

 

 

(1) 3070-023 Rear Insulation Panel 
(2) 3070-026 Vermiculite Baffle 
(1) 5680-002 Bottom Heatshield 
(1) 5680-010 Secondary Air Riser/Pipe 
(1) 5680-014 Baffle Guard 
(1) 5860-018 Secondary Air Deflector 

 

 

 

 

 
Before You Begin
:

  These components must be correctly installed prior to using this 

appliance. Completely read instructions before attempting this installation. 
 

Procedure: 

 

1)  Place rear insulation panel against the center of the rear casting, along with the 

left side rear refractory stone.  
 

 

Photo 1. Insulation panel placed behind left rear refractory stone. 

 

Reviews: